HS2 Construction Works Great Missenden

A CAT hydraulic excavator and a Bomag drum roller are used in preparatory works for the construction of the HS2 high-speed rail link on 17th April 2024 in Great Missenden, United Kingdom. Construction of the first leg of HS2 began in September 2020 but high-speed trains are not expected to run on the line until at least 2029. HS2 is the largest infrastructure project in Europe. (photo by Mark Kerrison/In Pictures via Getty Images)
A CAT hydraulic excavator and a Bomag drum roller are used in preparatory works for the construction of the HS2 high-speed rail link on 17th April 2024 in Great Missenden, United Kingdom. Construction of the first leg of HS2 began in September 2020 but high-speed trains are not expected to run on the line until at least 2029. HS2 is the largest infrastructure project in Europe. (photo by Mark Kerrison/In Pictures via Getty Images)
HS2 Construction Works Great Missenden
EINE LIZENZ KAUFEN
Wie darf ich dieses Bild verwenden?
Fr. 335.00
CHF

DETAILS

Einschränkungen:
Bei kommerzieller Verwendung sowie für verkaufsfördernde Zwecke kontaktieren Sie bitte Ihr lokales Büro.
Bildnachweis:
Mark Kerrison / Kontributor
Redaktionell #:
2147905446
Kollektion:
In Pictures
Erstellt am:
17. April 2024
Hochgeladen am:
Lizenztyp:
Releaseangaben:
Kein Release verfügbar. Weitere Informationen
Quelle:
In Pictures
Objektname:
MK-20240417-HS2-construction-works-Great-Missenden-0015
Max. Dateigröße:
5049 x 3366 px (42,75 x 28,50 cm) - 300 dpi - 11 MB